If something like this happens than how you may handle this situation?
Do not allow shuttering or concreting
Prevent the error from becoming permanent
Check:
Column position off grid
Wrong column size
Incorrect number or diameter of bars
Inadequate cover
Wrong lap or anchorage
Stirrups spacing incorrect
Not all misplacements have the same severity.
3. Measure & Compare with DrawingsMeasure actual position using tape / total station
Compare with latest structural drawing
Record deviation in mm
Minor deviation (within permissible tolerance)
→ may be acceptable with approval
Major deviation
→ must be rectified
(Never decide alone—structural approval is mandatory.)
5. Inform Senior Engineer / ConsultantExplain:
Type of error
Extent of deviation
Stage of work
Submit photos and measurements
Possible actions:
Shift reinforcement cage to correct position
Refix bars and ties
Increase cover using spacers
Add additional bars (only if approved)
Partial dismantling and re-fixing
⚠️ Never cut, bend, or add bars without written approval.
7. Re-Inspection & DocumentationGet corrected reinforcement re-checked
Obtain approval before concreting
Record in site register / inspection checklist
Never adjust “by eye”
Never proceed to concrete thinking “it’s small”
Never hide the mistake
If column reinforcement is misplaced, I stop the work, measure and compare with drawings, assess tolerance, inform the senior/consultant, rectify only as approved, and proceed with concreting only after re-inspection.